Piping Systems
EOS Mechanical specializes in complete piping system solutions for commercial and institutional facilities. From chilled water systems serving entire campuses to intricate medical gas installations, we deliver reliable piping infrastructure that forms the backbone of modern building systems.
What We Install
Hydronic Systems
- Boiler systems (up to 820 MBH capacity)
- Hydronic heating loops with copper and steel piping
- Expansion tanks and air separation equipment
- Circulating pumps and pump packages
- Glycol fill stations and systems
- Inline magnetic filters for system protection
Chilled Water & Cooling
- Water-cooled chillers (500-1000+ ton capacity)
- York YMC magnetic bearing centrifugal chillers
- Chilled water distribution piping (up to 12” diameter)
- Cooling tower piping and connections
- Condenser water systems
- Fan coil unit piping and connections
Steam & Condensate
- Steam distribution systems
- Condensate return systems
- Steam trap installations
- Pressure reducing stations
Specialized Piping
- Medical gas systems (oxygen, vacuum, medical air)
- Deionized water distribution
- Snow melt systems
- Laboratory process piping
Advanced Capabilities
Laser Scanning & 3D Modeling
For complex installations, we use laser scanning to capture existing conditions, develop point clouds, and model new construction virtually. This allows us to:
- Identify conflicts before installation begins
- Provide piping assemblies prepared off-site
- Coordinate with other trades more effectively
- Reduce field installation time
- Minimize disruptions to operating facilities
Assembly Services
We provide pump packages, piping assemblies, and equipment connections prepared in our shop. This approach delivers several advantages:
- Quality control in a controlled environment
- Faster on-site installation
- Reduced coordination issues
- Ability to maintain existing operations longer
- Better schedule certainty
Project Experience
We’ve completed piping installations in critical environments where failure is not an option:
- Hospital chiller plants serving entire campuses
- School boiler rooms requiring summer shutdown coordination
- Operating facilities where existing systems must remain operational
- Federal facilities with strict security and quality requirements
Union Expertise
Our pipefitters are members of Chicago Pipefitters Local 597 and Plumbers & Steamfitters Local 157. They bring decades of combined experience installing, testing, and commissioning mechanical systems across Greater Chicago.
Technical Coordination
Piping projects require careful coordination with other trades and building systems. We work directly with:
- Mechanical engineers to verify design intent
- Structural engineers for support requirements
- Controls contractors for sensor and actuator locations
- General contractors for schedule and logistics
- Building owners for shutdown coordination and testing
We update submittals and RFIs in real time, making project information accessible 24/7 to keep everyone aligned.
Why Work With Us
We install piping systems that work. Our superintendents plan every detail—from equipment rigging to system flushing—ensuring installations meet specifications and perform as designed. When you need reliable piping installation backed by experienced union pipefitters, we deliver.
Relevant for these audiences:
Interested in this service?
Contact us to discuss your project requirements and get a quote.